
Photo taken
31 March 2025















| |
SELECTED WORK ACHIEVEMENTS
Below are selected work accomplishments
during my consulting work with previous companies.
1. Pit Optimisation
(Four-X)
|
East Africa Gold Corporation, Tanzania [Gold]
 |
Preliminary pit optimisation for Buckreef, Kitongo and Nyakafuru
gold projects in Tanzania.
|
An Feng Kingsteam
Steel Ltd, Australia [Iron Ore]
 |
Cost compilation and pit optimisation update for Weld
Range and Tallering Peak (T3-T4 and T5) iron ore deposits.
|
Uranium Australia NL (for Signet), Australia
[Nickel]
 |
Pit Optimisation of the Syerston Nickel Deposit in WA.
|
Intermin Resource Corporation Ltd, Australia
[Gold]
 |
Cost compilation and pit optimisation of the Binduli Gold
Porphyry Project in WA.
|
PT. Darma Henwa (Henry Walker), Indonesia
[Basalt Aggregates]
 |
Aggregates quarry modelling and volume estimation of the
Gunung Sembung Area, West Java.
|
|
2. Resources/Reserve Estimation
An Feng Kingsteam Steel Ltd, Australia [Iron Ore]
 |
Geostatistical
review update of the Weld Range and Tallering Peak Iron Ore deposits in
Western Australia.
|
Meekatharra Minerals Indonesia, Australia [Gold]
 |
Independent
resource and reserve validation of the Way Linggo Gold Prospect in Sumatra,
Indonesia. Provided classical and geostatistical analyses and writing
report.
|
International Mining Consultants, London, UK [Gold, Nickel Laterite,
Bauxite, Iron Sands]
 |
Independent
resource and reserve estimation of PT. Aneka Tambang (ANTAM) projects as
part of the due diligence work by IMC (1997). The projects covered involved
gold, nickel, bauxite and iron sands. This was updated in September 1998 and
June 1999 for the ASX listing requirements.
|
Prima Resources NL, Australia [Gold]
 |
3D Ore body
modelling Tambang Sawah Gold Project in Kalimantan, Indonesia
|
International Pursuit Corporation, Canada [Copper-Gold]
 |
Data Management
and Geostatistical Study on the optimum drill spacing for the Hinoba-an
Copper-Gold Project in Negros Island, the Philippines.
|
PT. Natarang Mining, Indonesia [Gold]
 |
Resource audit
of the Way Linggo Gold Project in Sumatra, Indonesia.
|
PT. Indo Mineratama (Freeport-McRoran Indonesia) [Mineral Sands]
 |
Ore body
modelling and resource estimation of the Otomona (Tailings) Mineral Sands
Project.
|
Straits Resources N.L., Australia [Coal]
 |
Data Management,
Ore Body Modelling and Resource Estimation of PT. Bahari Cakrawala Sebuku's
Coal Project in Kalimantan, Indonesia.
|
International Pursuit Corporation, Indonesia [Alluvial Gold]
 |
Resource
Evaluation of PT. Sungai Kencana's Sungai Raya Alluvial Gold Project in West
Kalimantan.
|
PT. Puncakbaru Jayatama (Newcrest Resources Ltd.) [Gold]
 |
Technical Audit
and Resource Estimation of the Gosowong Gold Project in Halmahera Island,
Indonesia. |
Philsaga Mining Corporation, Philippines (Affiliate of Ten Sixty Four Ltd,
Australia) [Gold]
 |
Technical Audits
and Annual Resource Estimation of the CoO Gold Deposit in the Philippines
compliant to the JORC code reporting standards for ASX announcements.
|
|
3. Independent Evaluation/Valuation
|
Intermin Resource Corporation Ltd, Australia [Gold]
 |
Confidential
undertaking. A due diligence study of several precious metals tenements in
Western Australia that were on offer to Intermin.
|
Roper River Gold NL, Australia [Nickel & PGM]
 |
Confidential
undertaking - completed an independent geological review and valuation of a
Ni-PGM property in WA.
|
Croesus Mining NL, Australia [Gold]
 |
Confidential
undertaking - performed an independent evaluation of a certain gold prospect
in Western Australia.
|
An Feng Kingsteam Steel, Australia [Iron Ore]
 |
Geologic review
of the Tallering Peak Iron Ore Deposit in Western Australia. Objective is to
collate available geological and geochemical data to generate a conceptual
model to aid the current resource-drilling program.
|
Alterra Resources Inc., Canada [Gold, Copper]
 |
Title search and
verification of the proposed Indonesian mineral properties of Alterra
Resources Inc.
|
Alterra Resources Inc./American Manor Corp., Canada [Gold & Copper]
 |
Independent
technical review of certain mineral properties in Indonesia.
|
SNC Lavalin International, SE Asia, Indonesia [Gold]
 |
Independent
Geologic Review of Ciawitali Gold Prospect in West Java, Indonesia.
|
Gold Mines of Sardinia Ltd., Australia [Gold]
 |
Independent
Geologic Review of a Gold Prospect (KP-941) in West Java, Indonesia.
|
Kilborn Engineering, Indonesia [Gold]
 |
Independent
geological review of several Aneka Tambang KP's in Java, Indonesia.
|
King Surafis Pty Ltd (for BFP Consultants) [Gold]
 |
Independent
geological review of a gold project in West Sumatra, Indonesia.
|
|
4. Project & Data Management/Bureau Services
|
Geographe Resources Ltd. [Gold, Copper]
 |
Bureau services
that involved data validation and producing plans for their geochemical
sampling campaign.
|
Barrick Gold Corporation - Indonesia [Gold]
 |
Database
management and initial and progress supervision of the use of GIS on their
project.
|
PT. Gantari Utama, Indonesia [Coal]
 |
Generation of
graphics in their presentation of a technical paper at the CoalTrans Asia
Conference in Bali, Indonesia, June 1997.
|
Tanqueray Resources, Canada [Gold]
 |
Administered on
an advisory capacity the project manning/hiring and logistics of the
company's gold prospects in Kalimantan, Indonesia.
|
PT. Rio Tinto Indonesia, Indonesia [Gold]
 |
Supervised
digitising and data conversion of geologic maps for their Laos and
Indonesian prospects.
|
PT. Indo Mineratama, Indonesia [Gold]
 |
Digital data
editing and validation of drainage base and geochemical sample locations for
a gold prospect in Kalimantan, Indonesia.
|
International Pursuit Corporation, Canada [Gold]
 |
Geological
database advisory and training.
|
PT. Puncakbru Jayatama (Newcrest), Indonesia [Gold]
 |
Computing
advisory and support for the group.
|
Ocean Resource NL, Australia
[Gold]
 |
Presentation
graphics using interactive computer program for the Diamond Convention in
Perth, Australia.
|
International Pursuit Corporation, Indonesia [Gold]
 |
Database
management and trouble shooting of software problems.
|
Golden Valley Services Pty. Ltd., Australia [Gold]
 |
Project
Management of the company's gold prospect in Central Java, Indonesia.
|
ERI Ventures Inc., Canada [Gold]
 |
Project
Management of the company's gold prospect in West Java, Indonesia. The
project included grass roots exploration to drilling.
|
PT. Minorca Pratama Indonesia [Gold]
 |
Project
Management of the company's gold projects located in Aceh and Kalimantan,
Indonesia. The project included grass roots exploration to semi-detailed
geologic mapping.
|
Barrick Gold Corporation, Indonesia [Gold]
 |
Project leader
for the computerisation and digitisation of several tenements in Kalimantan
and Irian Jaya.
|
PT. Bumi Karindo, Indonesia [Gold]
 |
Attained a six
months contract to oversee the project management of a gold prospect in West
Java, Indonesia. The job included regular site inspection, selection, and
hiring of key personnel, data management, and technical advisory.
|
|
5. Mining Operations & Exploration
|
Benguet Corporation
[Gold]
 |
Planned and
supervised open pit drilling evaluation of 5 million tonnes @ 2.5 gm Au/t of
Acupan's GW orebody which attained a monthly production of 342 Kg Au.
|
 |
Carried out
detailed mine evaluations of Nalisbitan Gold Mine (1.5 million tonnes @ 1.73
gms Au/t) and Co'O Gold Mine (745,000 tonnes at 7.1 gms Au/t).
|
 |
Economically
maintained (increased) the ore reserve position of the open pit and
underground mines in Baguio Gold District.
|
 |
Contributed to a
safe working environment of both open pit and underground operations by
conducting regular inspections.
|
Longos Gold Mine (Paragon Resources NL)
[Gold]
 |
Undertook
collaborative planning activities associated with development of the mine's
future open cut (400,000 tonnes @ 3.5 gms Au/t) and underground operations
(1.2 million tonnes @ 14 gms Au/t) to achieve an average production rate of
25 kg/month.
|
 |
Planned and
delineated an exploration project which provided additional resources of
500,000 tonnes @ 4.1 gms Au/t.
|
|
6. Employment with Leigh Mardon
|
Some of the
significant work achievements while at Leigh Mardon Australasia (American
Banknote) are as follows:
 |
Restructured the
Data Processing Operations by reviewing existing labour, qualifications,
experience and work attitude of all personnel. This review led to the
relocation and hiring of new DP operators that are suited to the dynamic
nature of the business.
|
 |
Reviewed the processes and equipment used by the department. This
resulted in the upgrade of old workstations to state of the art computers
and up to date software.
|
 |
Revised and
improved the documentation and work instructions within the department
making it easy to understand, coherent and abiding with the ISO9000
accreditation.
|
 |
Reinforced a
work ethic recognising that DP Operations is a service bureau with the aim
of providing products only to satisfy customer requirements.
|
 |
Redesigned the
office and work area to make it more efficient.
|
 |
Trained and
supervised new DP Operators on the various data management and processing
procedures, emphasising the need for focus, attention to detail and
security.
|
 |
Interacted with
IT programmers on the improvement of in-house software. Have also been
involved in writing codes in Visual Basic 6.
|
 |
Liaised with
various clients on the issues pertaining to their data.
|
 |
Have been part
of the team who regularly make tender presentations to clients. This has led
to successful retention of big contracts from which the company acknowledged
my involvement.
|
 |
With the above
record of accomplishment, I was commissioned by the company to visit Leigh
Mardon’s Ingleburn Office, Sydney to review their current processes and put
forward recommendations for improvement.
|
 |
Was given
several Project Management tasks among them was the transfer of the PIN
Bureau to the Secura PIN business unit. Also as a team member in a major
project of transferring the entire secure cheque printing business
from Sydney to the Melbourne printing plant.
|
 |
As at September
2002, was handed the task of overseeing the Quality Assurance aspect of the
company's Personalisation Plant (Highett Production Site). This task entails
functioning as Quality Assurance Manager responsible for the upkeep,
continuous improvement and monitoring of the company's ISO9001:2000
certification. This function involved various projects of converting
the predominantly paper based system to a digital/electronic system (e.g.
document control, customer complaints, among others). This project was
successfully completed by February 2003 and the company was ISO9001:2000
certified until 2006. |
 |
As at
November 2005, was appointed as the Project Manager for developing
the Scanning business capability of Leigh Mardon. This project
involves the research, development and testing of the various
scanning technologies currently available in the market for possible
integration to Leigh Mardon's business solutions. |
 |
As at
January 2006, was given a project to develop a KPI capture,
measuring and reporting system for the "secure personalisation
production plant." The resulting system was popular company wide
that it was rolled out to other business units where I am used as a
resource for development and implementation. |
 |
As at
March 2006, was appointed as System Administrator for the "Time and
Attendance" project. This task involves acquiring new technical IT
skills in the e-Tivity software to manage the day-to-day
administrative tasks as well as conduct training and trouble
shooting. The project went live in the last week of August
2006. |
|
7. GeoScience Victoria - DPI
|
Gold Undercover Initiative
[Gold]
 |
Project Lead
in the validation and quality control of the State's comprehensive borehole
(Project GSV04) and geochemistry (Project GSV05) databases for on-line
publication through GeoVic (http://dpi.vic.gov.au/minpet)
|
Mineral Occurrence Data Model
 |
Has been
appointed to be a member of the Mineral Occurrence Data Model Working Group
to represent the state of Victoria. The working group has the objective of
formulating a standard data exchange in regards to mineral occurrence models
Australia-wide. |
|
8. AMC Consultants Pty Ltd
|
Mineral Deposits Limited, Senegal [Heavy
Mineral Sands]
 |
Comparative
analysis of heavy mineral sands assays between bulk samples from
Shafts, RC and Auger drilling for the Grande Cote project in
Senegal. |
Peak Gold Desktop Review, Western Australia
[Gold]
 |
Assisted in
the compilation of documentation for a confidential technical
review/due diligence of certain gold assets in Western Australia. |
Ormonde Mining Plc, UK [Copper]
 |
Block model
review of the La Zarza deposit in southern Spain. |
Kazakhmys Plc, UK [Copper]
 |
Performed data validation and
wireframe modelling of the copper porphyry oxide zone for resource
and reserve estimation of the Aktogay project. |
Roseberry Mine, Tasmania [Zinc, Base Metals]
 |
Technical
Review of the geology and resources of the Roseberry Mine, Tasmania
of Zinifex in behalf of Grant Samuel & Associates. |
LARCO, Greece [Nickel Laterite]
 |
Successfully
obtained a contract for the auditing of the company's Nickel
laterite & Lignite deposits in Greece. |
|
9. Dragon Mountain Gold Pty Ltd
|
 |
Just as DMG was getting well into exploration on
several geographically separate projects in China the global
financial crisis reduced the availability of funds for exploration
which meant a drastic change in plan. James was able to successfully
take up the challenge and fill several exploration roles managing
the continuation of work spanning the large and widespread tenements
(TB Moylan, GM) |
 |
Successfully upgraded the Liba resources (Indicated) and
released the maiden resource for Ma Gou projects compliant to the
JORC code reporting standards. |
|
10. Mining Plus Pty Ltd
|
CopperChem, Australia [Copper]
 |
Geological Services:
Database management review, block model validation and implementing
drilling protocols on the Great Australia Mine, Cloncurry, QLD,
Australia. |
 |
Due diligence review of Mt.
Colin copper deposit in Queensland, Australia. |
 |
Geological mentoring in
mine geology and grade control. |
Bezant Resources Plc, WA, Australia [Copper - Gold]
 |
JORC Compliant resource review and
description of the Guinaoang Cu-Au Deposit in Mankayan Gold District,
Benguet Province, the Philippines. |
Albidon Limited, WA, Australia [Nickel Sulphides]
 |
Munali
Nickel Mine, Zambia. Site visit to conduct drill hole
database compilation and validation; resource and reserve
reconciliation; audit of operational procedures and documentation
for geological activities; and supervision and guidance for the
Mining and Geology teams. |
Bezant
Resources, WA, Australia [Copper]
 |
Block model review and validation of the
Guinaoang Porhyry Copper deposit in Makayan, the Philippines.
|
Severstal Resources, Russia [Iron Ore]
 |
Block model review and validation of
the Kirovogorsky and Olenegorsky iron ore deposits. |
Wings Iron, Pea Ridge Deposit, USA [Iron Ore]
 |
Resource review to JORC compliant
reporting. |
Rex Minerals, Hillside Project, SA, Australia [Copper
- Gold]
 | Geological mentoring and advisory on
resource development. |
Slamon River Resources Ltd, Mt. Manning Iron Ore
Project, WA, Australia [Iron Ore]
 |
Project guidance
and resource review to NI 43-101 compliant reporting.
|
Priargunskiy Project, Russia [Uranium]
 |
Resource review and block model
validation of a uranium deposit to JORC compliant reporting. |
Newcrest Tanami, Carbine Deposit, NT/WA, Australia [Gold]
 |
Resource review and block model
validation of a gold deposit. |
Buckingham Exploration, WA, Australia [Copper,
Gold, Coal]
 |
Due diligence review of a Copper &
Gold project in Sulawesi, Indonesia. |
 |
Due diligence review of a Coal
project in Central Kalimantan, Indonesia. |
Delta Minerals Corporation, Vancouver, Canada [Gold]
 |
Due diligence review two Gold Mining
Operations in Victoria, Australia. |
Orko Silver Corp, Vancouver, Canada [Silver]
 |
Supervision and mentoring of
geologist in the resource modelling of the La Preciosa silver deposit
located in Durango State, Mexico. |
|
11. Intrepid Mines Ltd
|
 |
Successfully
assessed and assisted in the update and upgrade oxide and porphyry
resources of the Tujuh Bukit Project in Indonesia. Signed off as QP
with overall responsibility for the Technical Report (NI 43-101)
submitted to the Ontario Stock Exchange (SEDAR). |
 |
Part of the
company’s two man technical team that completed the Engineering
Study (Pre-Feasibility) for Tujuh Bukit Project. This project was
completed end of March 2013 that made myself redundant.
|
|
12. Natural Resources Industry Consultants
|
Geological Survey of Victoria (Department of
Primary Industries), Melbourne, VIC, Australia [Various]
 |
Been
commissioned by the Geological Survey of Victoria (Department of
Primary Industries – Victoria) to undertake high-level confidential
independent expert review of technical and mineralisation reports
whether they are compliant to JORC 2004 reporting standards as well
as the Ministerial Guidelines. |
Raub Australian Gold Mine, Pahang, Malaysia [Gold]
 |
Been commissioned to
review the resources and reserves reports whether it is JORC compliant, as
well as prepare an exploration program to upgrade the exploration targets to
inferred and indicated resources category. |
|
|
|
|
|
|
|