Principal
Resource Geologist
April 2012 -
March 2013
Position
Summary
As the Principal Resource Geologist, I am
responsible for managing the company’s geological databases and associated
resource models.
The typical activities include:
 |
Manage the quality
assurance and quality control (QA/QC) system |
 |
Management of the
geological database information system |
 |
Control of
geological interpretation processes and 3-dimensional modelling |
 |
Management of third
party, independent resource estimation consultants |
 |
Work closely with
metallurgical consultants in developing and executing metallurgical test
work plans for the feasibility studies. |
 |
Assistance in
preparation of mineral resource and reserve statements compliant with JORC
Code and CIM |
 |
Assistance in writing
of NI-43101 Technical Reports |
 |
Calculation, justification and proposal, then later management and
monitoring of annual budget requirements for the resource geology team. |
Achievements
 |
·
Successfully assessed and
assisted in the update and upgrade oxide and porphyry resources of the
Tujuh Bukit Project in Indonesia. Signed off as QP with overall
responsibility for the Technical Report (NI 43-101) submitted to the
Ontario Stock Exchange (SEDAR). |
 | Part of the company’s two man
technical team that completed the Engineering Study (Pre-Feasibility)
for Tujuh Bukit Project. This project was completed end of March 2013
that made myself redundant |
|